Xiamen Comwinning Imp.&Exp.Co.,Ltd

Supply the world class Construction Lifts for the users. TUV approved products. Xiamen Comwinning Imp. & Exp. Co., Ltd. / KANGBO MACHINERY GROUP

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Building Site Hoist /

Q345B Steel Plate Building Hoist Lift , Modular Hoist For Building Construction

Contact Now
Xiamen Comwinning Imp.&Exp.Co.,Ltd
Visit Website
City:xiamen
Province/State:fujian
Country/Region:china
Contact Person:Chen Junjie
Contact Now

Q345B Steel Plate Building Hoist Lift , Modular Hoist For Building Construction

Ask Latest Price
Video Channel
Brand Name :KANGBO
Model Number :Building site hoist rack and pinion SC200BG MP-B11 SC200/200BG MP-B12
Certification :TUV, CCC
Place of Origin :CHINA
MOQ :1 set
Price :In USD
Payment Terms :T/T, L/C
Supply Ability :150 sets per month
Delivery Time :25-30 days
Packaging Details :Export package
name :building hoist lift
Design :Truly Modular Design
Material :Q345B steel plate
Production :Processed by CNC machines
Drive unit :Variable Frequency Drive (VFD)
Color :Yellow
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Building site hoist rack and pinion SC200BG MP-B11 SC200/200BG MP-B12

Features and Advantages
* The modular and standardizing system makes the Kangbo construction elevators be flexible, efficient, safe, productive, low energy consumptive and ownership cost, making them the best choice for both construction and rental companies.
* The material hoist runs without vibration or trembling. The man and material lift starts and stops without surging or jerking.
* The passenger and elevator is reliable with very little breakdown and is durable with very long work-life.
* Adopt energy-saving helical reducers made specially for rack and pinion elevators, extremely strong, reliable and durable.
* Racks centering at mast reduce partial load torque of builders hoists, makes the construction hoists run more stably and smoothly.
* Applying non-eccentric rollers, make the installation of construction site elevators be faster and easier, with much less error.
* The integrated elevator car roof, which made by a steel plate with edges fully welded one time to complete, enhance hoist cage strength and ensure no water leakage.
* The additional big size third door at the cage side let the users to use fork trucks to load/unload extremely heavy and big size materials.

Technical Data

Item & Article No. SC200BG, MP-B11; SC200/200BZ, MP-B12
Payload Capacity 2,000 KG per Cage
Lifting Speed 0–60 m/min.
Max. Lifting Height 450 m
Cage Size (internal) 3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage
Cage Doors 3 Doors, Entry Door + Exit Door + Side Door
Motor Control FC (Frequency Control)
Engine Power 3x15 KW per Cage
Gearbox Helical Gearbox
Safety Device Type Centrifugal Brake
Power Supply Range 380–500 V, 50 or 60 Hz, 3 Phase
Type of Mast Square Column 650*650 mm with Bolted Rack
Length Mast Section 1.508 m
Rack Module 8
Inquiry Cart 0