Xiamen Comwinning Imp.&Exp.Co.,Ltd

Supply the world class Construction Lifts for the users. TUV approved products. Xiamen Comwinning Imp. & Exp. Co., Ltd. / KANGBO MACHINERY GROUP

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Passenger And Material Hoist /

Building Site 450m Rack & Pinion Personnel And Materials Hoist

Contact Now
Xiamen Comwinning Imp.&Exp.Co.,Ltd
Visit Website
City:xiamen
Province/State:fujian
Country/Region:china
Contact Person:Chen Junjie
Contact Now

Building Site 450m Rack & Pinion Personnel And Materials Hoist

Ask Latest Price
Video Channel
Brand Name :KANGBO
Model Number :Passenger and material hoist rack and pinion SC200BG MP-B11 SC200/200BG MP-B12
Certification :TUV, CCC
Place of Origin :CHINA
MOQ :1 set
Price :In USD
Payment Terms :T/T, L/C
Supply Ability :150 sets per month
Delivery Time :25-30 days
Packaging Details :Export package
name :Personnel And Materials Hoist
Application :Building Site
Design :According to European Regulation
Material :Q345B steel
Processing :Processed by CNC machines in tool fixtures
Color :customized
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Building Site Q345B Steel Personnel And Materials Hoist

Personnel And Materials Hoist Introduction

1. All Production Line adopt special fixture, mould, gauge made by us to ensure all detailed size.
2. Select high quality raw material from China Bao Steel Group, other like motors ,reducers, gearbox, safety device with low noise, electrics is schneider or Korea repute brand with reliable quality
3. Special design,compact and reasonable structure,easy to installation and adjustment.
4. Each equipment should be test and make record in Factory, all details will be adjust like motor brake, safety device operation, all limit switch operation, dropping test, loading test, and mast section erection test to ensure the completed equipment run well when take into use.

Personnel And Materials Hoist Configuration

There is the additional 'C' door at cage side for convenient loading/unloading.
Available in single or twin hoist cage configuration.
The construction rack and pinion elevators are Variable Frequency Drive (VFD), with low starting current and much less wear and tear, very smooth starting and stopping.
Manual or Automatic Controls of the hoist is optional.

Personnel And Materials Hoist Technical Data

Item & Article No. SC200BG, MP-B11; SC200/200BZ, MP-B12
Payload Capacity 2,000 KG per Cage
Lifting Speed 0–60 m/min.
Max. Lifting Height 450m
Cage Size (internal) 3.2(Length)*1.5(Width)*2.35(Height) Meter per Cage
Cage Doors 3 Doors, Entry Door + Exit Door + Side Door
Motor Control FC (Frequency Control)
Engine Power 3x15 KW per Cage
Gearbox Helical Gearbox
Safety Device Type Centrifugal Brake
Power Supply Range 380–500 V, 50 or 60 Hz, 3 Phase
Type of Mast Square Column 650*650 mm with Bolted Rack
Length Mast Section 1.508 m
Rack Module 8

Building Site 450m Rack & Pinion Personnel And Materials Hoist

Inquiry Cart 0