
Add to Cart
Energy Efficient Safe TUV Certificated Construction Site Elevator
Construction Site Elevator Introduction
1. The protection device is complete and advanced, and the anti-fall safety device equipped with national patent technology has the reliability of the first in its kind;
2. The driving unit is placed above the top of the cage, and the carrying space in the cage is large;
3, using a three-drive structure, a large carrying capacity;
4. The attachment device is stable, safe and reliable;
5, small footprint;
6, the transmission is stable, the vibration is small, and the ride is comfortable;
7. Lightweight structure, convenient for maintenance and disassembly.
8. The transmission mechanism adopts the three-motor drive form to make the gear racks evenly and safely.
9. Ensure that the elevator is safely operated, and the safety switch such as overload and speed limit is set in the circuit. When the above situation occurs during operation, the elevator automatically avoids accidents. Each door on the cage also has a limit switch. When any one door is abnormally opened, the cage cannot start or stop running immediately.
10. Each cage is equipped with anti-fall safety device, which can effectively prevent the cage from falling and ensure the safe and reliable operation of the elevator.
11. The lifting electrical control system has simple wiring, easy operation, maintenance and reliability. When the elevator is in normal operation, the elevator can be operated by the handle or button in the cage. It can be stopped at any position where parking is required. At the upper and lower terminal stations, the upper and lower terminal limit switches control the automatic stop, if the upper and lower terminals are limited. When the switch does not work due to a fault, the limit switch set on the lift can cut off the power supply and brake it in time.
12. The steel structure design has been scientifically and rigorously calculated to achieve the requirements of reasonable structure, reliable strength and light weight. The seamless steel pipe is used for 0.65×0.65×1.5m.
13. The lift can use the boom on the cage to install or remove the rail frame. The rest of the parts can be easily installed and removed, and the parts are easy to replace.
Construction Site Elevator Production and Materials
KANGBO implements the true modular design of rack and pinion hoists, standardization and fine finishing of lifts parts and spare parts, and assembly line production. The material elevator components are versatile and universal.
Main structure frame are made of 16Mn and Q345 high strength cold roll steel plate, cut by laser, process by CNC machines in tool fixtures, welded by robots.
The construction lift cage roof is made by a full steel plate, and the edges are totally welded, to ensure no water leakage and high strength.
Construction Site Elevator Technical Data
Item & Article No. | SC200BG, KP-B11; SC200/200BG, KP-B12 Construction Site Elevator |
Payload Capacity | 2,000KG per Cage |
Lifting speed | 0–60 meter/minute. |
Max. lifting height | 450 m |
Cage width (internal) | 1.5 m |
Cage length (internal) | 3.2 m |
Cage height (internal) | 2.35 m |
Motor control | FC control |
Engine power | 3x15 KW per Cage |
Gearbox | Helical reducer |
Safety device type | centrifugal brake |
Power supply range | 380–500 V, 50 or 60 Hz, 3 phase |
Type of mast | square column 650*650 mm with bolted rack |
Length mast section | 1.508 m |
Rack module | 8 |